午夜国语福利在线观看片,亚洲 欧美 动漫 在线,亚洲成人av少妇,国产边靠边叫麻豆av

EN
The FGC project undertaken by Huaxing East for Shunyi Beijing WTE Phase III started construction.
2022.08.11

The flue gas cleaning (FGC) project undertaken by Huaxing for Shunyi WTE Phase III in Beijing was commenced on May 9, 2021.



The plant will build 1x800 t/d grate furnance and 1x18 mw condensing steam turbine with an annual operation of 8000 hours. FGC applies SNCR with urea denitrification in furnace + spray dry reactor with Ca(OH)2 + activated carbon and dry deacidification agent injection system with Ca(OH)2 + bag filter+GGH+SGH + SCR reactor with urea + fly ash conveying, storage and stabilization process. This is an EPC project of Huaxing.



The achievements of Huaxing East in Beijing include Tongzhou Phase II, Shunyi Phase III, etc.